Queensland

coin-icon

Tarong Energy Corporation Ltd

calendar-icon

October 2008 – November 2009

coin-icon

$28 million

stopwatch-icon

Complete

Scope

BMD was engaged on one of Queensland’s largest power stations to design, procure, construct, and commission the mine’s technically advanced ash disposal system.

The system collects, liquefies, pumps, transfers, and places ashy slurry from the two power stations to a disposal site 5 kilometres away.

The ash contraption involved the installation 2 kilometres of 150 millimetres in diameter, extra strong, carbon steel pipe, a megalitre steel tank, support structure and agitator to convert the ash to slurry (55% concentration).

Outcomes

BMD successfully managed the entire turnkey process including mechanical, civil, structural, electrical, and control features. BMD’s key initiatives for success included prompt design development, identifying and expediating procurement of long lead time items, and focusing on commissioning and operations early. Ultimately, ash placement in the mine void met the strict geological and environmental mine requirements.